VARIOUS SAN JOAQUIN VALLEY LOCATIONS: Contracted to perform and provide all requirements of the Designated Underground Storage Tank Operator Program as stated in the California Code of Regulations, Title 23, Chapter 16, Underground Tank Regulations to include: Conducting monthly visual inspections of the UST facility and providing on-the-job training for all facility employees.

SAN JOAQUIN COUNTY: Contracted to provide all scheduled and unscheduled maintenance, repair, testing, and necessary consulting to ensure continued uninterrupted service for eight County owned and operated gasoline and diesel dispensing facilities.

MARIPOSA COUNTY (Lake Don Pedro Transfer Station): Contracted to prepare and provide engineered drawings for tank pad, tank, electrical wiring, and tank enclosure; process and obtain building permits; furnish and install 1000 gallon used oil tank set up, including tank pad, tank, electrical wiring, vacuum pump, hose retractor, wand evacuation hook up kit, drop tube, combustible gas detector, containment cabinet, and tank enclosure.

MARIPOSA COUNTY (Mariposa County Landfill): Contracted to retrofit existing used oil facility with pumping capacity to evacuate large containers and a drain sink to accommodate evacuating small containers, including a vacuum pump, hose retractor, wand evacuation hook up kit, drop tube, combustible gas detector, containment cabinet-drain sink, and electrical wiring.

KERN COUNTY (Tehachapi): Contracted to design, furnish, install and place in operation and obtain final inspections for a 12,000 gallon high volume diesel dispensing system and a 4,000 gallon gasoline dispensing system complete with fuel management systems, tank gauging and tank monitoring systems all with remote access over the company LAN.

KERN COUNTY (Tehachapi): Contracted to remove gasoline, diesel, and used oil underground storage tanks to include all preparatory concrete demo work, soil evacuation, testing and the trucking and disposal of tanks, all with proper documentation and return of the site to its original landscape.

SACRAMENTO COUNTY:  Contracted to furnish and install a 1,000 gallon split compartment: 500 gallon diesel/500 gallon gasoline tank. Tank will be complete with all trim, vents, and tank spill containers. Independant dispensing systems for gasoline and diesel to include cabinet pumps with nozzles, hoses, retractors, and all necessary caps and accessories. Complete all necesary plumbing and electrical to place dispensing systems in operation.

 

Current Industry News

APRIL 1, 2009 DEADLINE

There are approximately 13,000 Gasoline Dispensing Facilities (GDFs) in California that must upgrade their dispensers to the latest Enhanced Vapor Recovery equipment prior to the above deadline. Presently only one EVR Phase II System has been certified. It is the Franklin Fueling/Healy System. Additional systems are being tested and are expected to be certified to meet the pending demand. GDF operators are encouraged to contact their local Air District prior to modifying any equipment to be sure it meets local standards.

A pending issue is the lack of a sufficient number of experienced Contractors certified to perform the modifications prior to the April 1, 2009 deadline. Bagley Enterprises is an experienced GDF installer and is Healy certified to perform the required modifications. GDF Operators in the San Joaquin Valley are encouraged to contact Bagley Enterprises to open a dialogue.

 

Bagley Enterprises, Inc.
2370 Maggio Circle, Suite 4, Lodi, CA 95240
Ph. 209.367.4800
Toll Free 877.833.4800
Email: info@bagleyenterprises.com
Serving Lodi, California and California, Directions

 

 

Did You Know?

Prior to April 1, 2009 approximately 13,000 Gasoline Dispensing Facilities (GDFs) in California, with underground storage tanks, must upgrade their facilities to comply with the latest   Phase II Enhanced Vapor Recovery requirements.

 

Current Projects

Various San Joaquin Valley Locations: Contracted to perform and provide all requirements of the Designated Underground Storage Tank Operator Program.

 

San Joaquin County: Contracted to provide all maintenance, etc., for eight County owned and operated gasoline and diesel dispensing facilities.

 

Mariposa County: Contracted to design, furnish, and install a used motor oil collection facility.

 

Mariposa County: Contracted to retrofit existing used oil facility with various features.

 

Kern County: Contracted to design, furnish, install and place in operation a high volume diesel dispensing system.

 

Kern County: Contracted to remove gasoline, diesel, and used oil underground storage tanks, etc.

 

Sacramento County:Contracted to furnish, install, and place in operation a gasoline & diesel dispensing system.

 

News Bulletin

We invite you to subscribe to our News Bulletin. Receiving our bulletin will keep you up to date with Bagley Enterprises as well as industry news items. Please take this opportunity to subscribe. We will not distribute your personal information. Please read our Privacy Notice

 

 
 
Copyright © 2005 Bagley Enterprises, Inc. All rights reserved.
Developed and marketed by DGT Internet Marketing